284 tonne lattice lifting beam

Description​

This lattice lifting frame was used to lift a 284 tonne superheater for the 300 million Euro waste-to-energy facility in Belgrade. The project will allow the Belgrade city government to close and remediate the Vinca landfill and generate over 80 MW of renewable heat and electricity. The lifting frame was an incredibly complex design and build, with a huge amount of quality requirements. At 16m in length, the frame connects directly to the superheater via 200+ connections (1mm deflection limitations) and be used to lift the superheater into place.