04-06 March 2025
ExCeL, London

Search
Close this search box.

Call for sepaker

Exhibit

Speak to a member of the team to enquire about exhibiting at Futurebuild 2024.
BOOK TO EXHIBIT

Pledge Wall

Plege wall

Learn more

Discover FutureX

Valuable content from expert

Vibrant Image from pervious year 

Learn from industry expert
Powering St. Modwen for a Greener Future
Rolec Services Limited

Powering St. Modwen for a Greener Future

Bespoke EV charging hardware and network deployed across multiple St. Modwen sites, addressing their diverse business and fleet requirements

Share

A hands on approach

As one of the longest standing EV chargepoint manufacturers in the UK, we have cultivated an extensive repertoire of projects globally. Working alongside not only developers like St Modwens but also those of Skanska, KIER, Goodman, Balfour Beatty, and more. Which has meant developing an adaptive approach to electric vehicle hardware that best meets the needs of businesses and developers.

And for us, this starts with unit design. By prioritising British manufacturing and developing a team of dedicated research and development engineers, we have our hand in all aspects of product testing and design. Constantly adapting our chargepoints to meet the needs of different industries and building designs.

Diverse product range

Units are divided into two groups: pedestals and wall-mounted units. Each of which has benefits for different use cases. Pedestals, for example, are optimal for shared locations, like workspaces and residential estates. They are designed to optimise available floor space by charging up to 4 cars simultaneously, have increased visibility thanks to their LED amenity lighting and eye-catching design.

On the other side of the coin, wall-mounted chargers (like our SecuriCharge unit) are the optimal choice for locations with less available floor space, such as underground car parks. Something that can also be a major consideration when installing hardware in more confined spaces.

Increasingly more important following the introduction of Part S, all major new developments need to designate a minimum of 20% EV parking (with charging) for visitors to the site. Something that can provide a unique set of challenges. Our 15 years of industry experience has perfectly positioned us to advise you through this process, from project conception to installation, and ongoing support.

Keep reading to find out more…

Contact this exhibitor

Scroll to Top