04-06 March 2025
ExCeL, London

Search
Close this search box.

Call for sepaker

Exhibit

Speak to a member of the team to enquire about exhibiting at Futurebuild 2024.
BOOK TO EXHIBIT

Pledge Wall

Plege wall

Learn more

Discover FutureX

Valuable content from expert

Vibrant Image from pervious year 

Learn from industry expert
Rail System for laying porcelain tiles, Albourne, West Sussex
WALLBARN & FIRE DECK

Rail System for laying porcelain tiles, Albourne, West Sussex

Laying promenade tiles onto flat roofs and podium decks is made fast and easy with improved performance.

Share

Laying promenade tiles onto flat roofs and podium decks is made fast and easy with improved performance. Improve the lateral stability of the tiled area by connecting each section together with a solid framework.

The individual adjustable support pedestals are connected to a strong profiled aluminium rail which clicks into each headpiece without the need for mechanical fixings. Expansion is accommodated by the rails being connected via long clips rather than screws. This forms an integrated framework of pedestals-and-rails which creates a solid raft like substructure to hold the tiles in place.

Contact this exhibitor

Scroll to Top