04-06 March 2025
ExCeL, London

Search
Close this search box.

Call for sepaker

Exhibit

Speak to a member of the team to enquire about exhibiting at Futurebuild 2024.
BOOK TO EXHIBIT

Pledge Wall

Plege wall

Learn more

Discover FutureX

Valuable content from expert

Vibrant Image from pervious year 

Learn from industry expert

introducing...

Øystein Ulvestad, Sweco

Øystein Ulvestad, BIM Developer, Sweco, specialises in model-based projecting, drawingless design and parametric design of bridges. In 2017 his team designed the world’s first concrete bridge built without drawings. In 2020 the team started design on Randselva bridge which currently holds the record as the longest bridge in the world designed and built without drawings, solely based on BIM-models. Randselva bridge won the Trimble Global BIM awards for best BIM-model in the world 2020.

0
VISITORS
0
STAGES
0
SESSION CURATORS
0
Speakers
0
Sessions
Scroll to Top